Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/21002 |
Ähnliche Einträge
-
Updated 6F-12F floor finish (RFA-544_Rev.A)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Details of floor finish plan (Architectural As Built Drawings)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024) -
5F demarcation of finishes (RFA-504_Rev.A)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
9F floor tiles layout and finishes (RFA-475_Rev.B)
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
6F floor tiles layout and finishes plan (RFA-479_Rev B)
von: WOHA Designs PTE LTD, et al.
Veröffentlicht: (2023)