Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
المؤلف الرئيسي: | |
---|---|
التنسيق: | Drawings |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/21000 |
id |
10361-21000 |
---|---|
record_format |
dspace |
spelling |
10361-210002023-09-19T21:02:27Z Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Architectural drawings Architectural designs Contractor shop drawing Curtain wall This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. Technical specification of W06 and W07 wall and window joint fixing; Curtain wall detail; Curtain wall detail 2023-09-19T04:39:15Z 2023-09-19T04:39:15Z ©2023 2023-07-15 Drawings Ref. no.: RFA-577-A Design no.: BRACU-AR-JD-01-5 http://hdl.handle.net/10361/21000 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 4 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project Architectural drawings Architectural designs Contractor shop drawing Curtain wall |
spellingShingle |
New campus project Architectural drawings Architectural designs Contractor shop drawing Curtain wall BUCG-ABC Joint Venture (BUCG-ABC JV) Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
description |
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. |
format |
Drawings |
author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
title |
Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
title_short |
Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
title_full |
Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
title_fullStr |
Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
title_full_unstemmed |
Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) |
title_sort |
technical specification of w06 and w07 wall and window joint fixing (rfa-577_rev. a & c) |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/21000 |
work_keys_str_mv |
AT bucgabcjointventurebucgabcjv technicalspecificationofw06andw07wallandwindowjointfixingrfa577revac |
_version_ |
1814308491763908608 |