Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)

This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF & DWG version of drawings.

Detalles Bibliográficos
Autores principales: WOHA Designs PTE LTD, BUCG-ABC Joint Venture (BUCG-ABC JV), Web Structures
Formato: Drawings
Lenguaje:English
Publicado: Brac University 2023
Materias:
Acceso en línea:http://hdl.handle.net/10361/20905
id 10361-20905
record_format dspace
spelling 10361-209052023-10-08T10:28:00Z Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I) WOHA Designs PTE LTD BUCG-ABC Joint Venture (BUCG-ABC JV) Web Structures New campus project Architectural drawings Architectural designs Contractor shop drawing Vehical entry & exit plan This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF & DWG version of drawings. Architectural - shop drawings of ramp (B3-B1) ; Vehical exit ramp plan and section; Bus entry and exit ramp plan and section; Vehical entry-exit ramp basement plan; Vehical entry-exit ramp section ; Vehical entry ramp plan; Vehical entry ramp section; Vehical entry-exit ramp basement plan and section; 2023-09-13T07:14:00Z 2023-09-13T07:14:00Z ©2023 2023-07-11 Drawings Ref: JV-BRACU-RFA-144_Rev I Design no.: RAMP-01 Design no.: RAMP-02 Design no.: RAMP-03 Design no.: RAMP-04 Design no.: RAMP-05 Design no.: RAMP-06 http://hdl.handle.net/10361/20905 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. application/pdf application/pdf application/pdf application/pdf application/pdf application/pdf application/pdf application/octet-stream Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
Architectural drawings
Architectural designs
Contractor shop drawing
Vehical entry & exit plan
spellingShingle New campus project
Architectural drawings
Architectural designs
Contractor shop drawing
Vehical entry & exit plan
WOHA Designs PTE LTD
BUCG-ABC Joint Venture (BUCG-ABC JV)
Web Structures
Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
description This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF & DWG version of drawings.
format Drawings
author WOHA Designs PTE LTD
BUCG-ABC Joint Venture (BUCG-ABC JV)
Web Structures
author_facet WOHA Designs PTE LTD
BUCG-ABC Joint Venture (BUCG-ABC JV)
Web Structures
author_sort WOHA Designs PTE LTD
title Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
title_short Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
title_full Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
title_fullStr Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
title_full_unstemmed Vehicle entry-exit ramp basement plan and section (RFA-144_Rev I)
title_sort vehicle entry-exit ramp basement plan and section (rfa-144_rev i)
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/20905
work_keys_str_mv AT wohadesignspteltd vehicleentryexitrampbasementplanandsectionrfa144revi
AT bucgabcjointventurebucgabcjv vehicleentryexitrampbasementplanandsectionrfa144revi
AT webstructures vehicleentryexitrampbasementplanandsectionrfa144revi
_version_ 1814306887600963584