Re: Finishing schedule
This record consists of general correspondence regarding the reply on finishing schedule of BRACU new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20853 |
Eitemau Tebyg
-
Finishing schedule
gan: Brac University
Cyhoeddwyd: (2023) -
Finish schedule detail (RFA-473_Rev.B)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Finish schedule detail (RFA-473_Rev B)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023) -
Regarding submitting the latest construction schedule
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding submitting master construction schedule plan
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)