Re: Finishing schedule

This record consists of general correspondence regarding the reply on finishing schedule of BRACU new campus project.

Bibliographic Details
Main Author: BUCG-ABC Joint Venture (BUCG-ABC JV)
Format: General correspondence
Language:English
Published: Brac University 2023
Subjects:
Online Access:http://hdl.handle.net/10361/20853
id 10361-20853
record_format dspace
spelling 10361-208532023-09-11T21:02:57Z Re: Finishing schedule BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project General correspondence Finishing schedule This record consists of general correspondence regarding the reply on finishing schedule of BRACU new campus project. 2023-09-11T10:02:23Z 2023-09-11T10:02:23Z ©2022 2022-02-09 General correspondence Ref.: BUCG-ABC JV/BRACU/010/22 http://hdl.handle.net/10361/20853 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
General correspondence
Finishing schedule
spellingShingle New campus project
General correspondence
Finishing schedule
BUCG-ABC Joint Venture (BUCG-ABC JV)
Re: Finishing schedule
description This record consists of general correspondence regarding the reply on finishing schedule of BRACU new campus project.
format General correspondence
author BUCG-ABC Joint Venture (BUCG-ABC JV)
author_facet BUCG-ABC Joint Venture (BUCG-ABC JV)
author_sort BUCG-ABC Joint Venture (BUCG-ABC JV)
title Re: Finishing schedule
title_short Re: Finishing schedule
title_full Re: Finishing schedule
title_fullStr Re: Finishing schedule
title_full_unstemmed Re: Finishing schedule
title_sort re: finishing schedule
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/20853
work_keys_str_mv AT bucgabcjointventurebucgabcjv refinishingschedule
_version_ 1814308768053198848