Re: Instruction on the type of waterproofing treatment to be done in different location
This record consists of general correspondence regarding the instruction on the type of waterproofing treatment to be done in different location of BRACU new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20852 |
Registos relacionados
-
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
Por: Brac University
Publicado em: (2023) -
Re-submit the evaluation for additional work of waterproofing
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Regarding risks of waterproofing work for BRAC University new campus
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Approved waterproof membrane as per RFA 80
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
The calculation of additional excavation for waterproofing
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)