Re: Instruction on the type of waterproofing treatment to be done in different location
This record consists of general correspondence regarding the instruction on the type of waterproofing treatment to be done in different location of BRACU new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20852 |
Ähnliche Einträge
-
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
von: Brac University
Veröffentlicht: (2023) -
Re-submit the evaluation for additional work of waterproofing
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Regarding risks of waterproofing work for BRAC University new campus
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Approved waterproof membrane as per RFA 80
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
The calculation of additional excavation for waterproofing
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023)