Re: Instruction on the type of waterproofing treatment to be done in different location
This record consists of general correspondence regarding the instruction on the type of waterproofing treatment to be done in different location of BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20852 |
مواد مشابهة
-
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Re-submit the evaluation for additional work of waterproofing
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding risks of waterproofing work for BRAC University new campus
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Approved waterproof membrane as per RFA 80
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
The calculation of additional excavation for waterproofing
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)