Reducing lead time as a strategy for achieving optimal KPI performance at Kuehne Nagel BD.
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2023.
1. autor: | Rahman, Afrina |
---|---|
Kolejni autorzy: | Chowdhury, Hasan Maksud |
Format: | Internship report |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20809 |
Podobne zapisy
-
A study on the environment and operations of Kuehne + Nagel Bangladesh Limited
od: Shahriar, Arfan
Wydane: (2024) -
Impact of COVID-19 on the logistics management industry supply chain in Bangladesh: a case study on an MNC- Kuehne + Nagel
od: Ddahar, Ive
Wydane: (2022) -
Assessment of procurement process of carriage rehabilitation project at Saidpur workshop implemented by Bangladesh railway based on Key Performance Indicators (KPI
od: Rahman , Md. Habibur
Wydane: (2021) -
An overview and operation procedure of KUEHNE+NAGEL Bangladesh Ltd.
od: Rana, Mehedi Hasan
Wydane: (2018) -
Supply chain management process of Andritz Hydro
od: Rakib, Tariqul Hasan
Wydane: (2024)