Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20798 |
Documenti analoghi
-
Replacement of the defective flush valve
di: Brac University
Pubblicazione: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
di: Brac University
Pubblicazione: (2023) -
Letter of flush valve replacement
di: Tillotoma Gulshan
Pubblicazione: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
di: Brac University
Pubblicazione: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
di: Brac University
Pubblicazione: (2023)