Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20798 |
समान संसाधन
-
Replacement of the defective flush valve
द्वारा: Brac University
प्रकाशित: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
द्वारा: Brac University
प्रकाशित: (2023) -
Letter of flush valve replacement
द्वारा: Tillotoma Gulshan
प्रकाशित: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
द्वारा: Brac University
प्रकाशित: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
द्वारा: Brac University
प्रकाशित: (2023)