Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/20798 |
Ejemplares similares
-
Replacement of the defective flush valve
por: Brac University
Publicado: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
por: Brac University
Publicado: (2023) -
Letter of flush valve replacement
por: Tillotoma Gulshan
Publicado: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
por: Brac University
Publicado: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
por: Brac University
Publicado: (2023)