Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20798 |
Similar Items
-
Replacement of the defective flush valve
by: Brac University
Published: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
by: Brac University
Published: (2023) -
Letter of flush valve replacement
by: Tillotoma Gulshan
Published: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
by: Brac University
Published: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
by: Brac University
Published: (2023)