Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20798 |
Eitemau Tebyg
-
Replacement of the defective flush valve
gan: Brac University
Cyhoeddwyd: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
gan: Brac University
Cyhoeddwyd: (2023) -
Letter of flush valve replacement
gan: Tillotoma Gulshan
Cyhoeddwyd: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
gan: Brac University
Cyhoeddwyd: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
gan: Brac University
Cyhoeddwyd: (2023)