Request for time extension due to flush valve issue
This record consists of general correspondence regarding the request for time extension due to unfit flush valves brought for BRACU new campus project.
Hlavní autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20798 |
Podobné jednotky
-
Replacement of the defective flush valve
Autor: Brac University
Vydáno: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
Autor: Brac University
Vydáno: (2023) -
Letter of flush valve replacement
Autor: Tillotoma Gulshan
Vydáno: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
Autor: Brac University
Vydáno: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
Autor: Brac University
Vydáno: (2023)