Delayed submission of check list for concreting work of BRAC University new campus project
This record consists of general correspondence regarding delayed submission of check list for concreting work of BRAC University new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20784 |
相似书籍
-
Delayed submitting of check list for concreting work
由: Brac University
出版: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Concrete design /
由: Gaventa, Sarah
出版: (2001)