Delayed submission of check list for concreting work of BRAC University new campus project
This record consists of general correspondence regarding delayed submission of check list for concreting work of BRAC University new campus project.
Автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/20784 |
Схожі ресурси
-
Delayed submitting of check list for concreting work
за авторством: Brac University
Опубліковано: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Concrete design /
за авторством: Gaventa, Sarah
Опубліковано: (2001)