Delayed submission of check list for concreting work of BRAC University new campus project
This record consists of general correspondence regarding delayed submission of check list for concreting work of BRAC University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20784 |
類似資料
-
Delayed submitting of check list for concreting work
著者:: Brac University
出版事項: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Concrete design /
著者:: Gaventa, Sarah
出版事項: (2001)