Delayed submission of check list for concreting work of BRAC University new campus project
This record consists of general correspondence regarding delayed submission of check list for concreting work of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20784 |
Documents similaires
-
Delayed submitting of check list for concreting work
par: Brac University
Publié: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Concrete design /
par: Gaventa, Sarah
Publié: (2001)