Delayed submission of check list for concreting work of BRAC University new campus project
This record consists of general correspondence regarding delayed submission of check list for concreting work of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20784 |
مواد مشابهة
-
Delayed submitting of check list for concreting work
بواسطة: Brac University
منشور في: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion