Issue about finishing the floor works on 4th & 5th floor
This record consists of general correspondence regarding the issue about finishing the floor works on 4th & 5th floor of BRACU new campus building.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20742 |
Podobne zapisy
-
5th floor decking slab
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
4th floor decking slab
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
Time extension of design change for 6th-8th floor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Time extension of design change for 6th-8th floor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)