Issue about finishing the floor works on 4th & 5th floor
This record consists of general correspondence regarding the issue about finishing the floor works on 4th & 5th floor of BRACU new campus building.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20742 |
Similar Items
-
5th floor decking slab
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
4th floor decking slab
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
Time extension of design change for 6th-8th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Time extension of design change for 6th-8th floor
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)