Issue about finishing the floor works on 4th & 5th floor
This record consists of general correspondence regarding the issue about finishing the floor works on 4th & 5th floor of BRACU new campus building.
Hlavní autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20742 |
Podobné jednotky
-
5th floor decking slab
Autor: WOHA Designs PTE LTD, a další
Vydáno: (2023) -
4th floor decking slab
Autor: WOHA Designs PTE LTD, a další
Vydáno: (2023) -
Time extension of design change for 6th-8th floor
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Time extension of design change for 6th-8th floor
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)