Issue about finishing the floor works on 4th & 5th floor
This record consists of general correspondence regarding the issue about finishing the floor works on 4th & 5th floor of BRACU new campus building.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20742 |
Ítems similars
-
5th floor decking slab
per: WOHA Designs PTE LTD, et al.
Publicat: (2023) -
4th floor decking slab
per: WOHA Designs PTE LTD, et al.
Publicat: (2023) -
Time extension of design change for 6th-8th floor
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Time extension of design change for 6th-8th floor
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)