Reference level marking on each floor of BRAC University new campus project
This record consists of general correspondence regarding reference "A" about level marking on each floor of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20708 |
Documents similaires
-
Reference level marking on each floor
par: Brac University
Publié: (2023) -
Event management of Mark8 Communications
par: Hossain, Mridha Faysal
Publié: (2016) -
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Shallow floor trap entrust purchasing issues of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
ব্র্যাক বিশ্ববিদ্যালয়ের নতুন ক্যাম্পাসের ভিতর দিয়ে ৩৩ কেভি ভূগর্ভস্থ ক্যাবল লাইনের As-built Drawing ও Route Marking প্রসঙ্গে
par: ব্র্যাক বিশ্ববিদ্যালয়
Publié: (2023)