Reference level marking on each floor of BRAC University new campus project
This record consists of general correspondence regarding reference "A" about level marking on each floor of BRAC University new campus project.
Main Author: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20708 |
Similar Items
-
Reference level marking on each floor
by: Brac University
Published: (2023) -
Event management of Mark8 Communications
by: Hossain, Mridha Faysal
Published: (2016) -
Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Shallow floor trap entrust purchasing issues of BRAC University new campus project
by: BUCG-ABC Joint Venture
Published: (2023) -
ব্র্যাক বিশ্ববিদ্যালয়ের নতুন ক্যাম্পাসের ভিতর দিয়ে ৩৩ কেভি ভূগর্ভস্থ ক্যাবল লাইনের As-built Drawing ও Route Marking প্রসঙ্গে
by: ব্র্যাক বিশ্ববিদ্যালয়
Published: (2023)