Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Tác giả chính: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20707 |
Những quyển sách tương tự
-
Regarding inspection report of fire pump at BRACU NCP
Bằng: Brac University
Được phát hành: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
Bằng: Brac University
Được phát hành: (2023) -
Preparation for the inspection visit to China
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
Bằng: Brac University
Được phát hành: (2023) -
Request to approve and release payment against assistance of inspecting work
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023)