Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Autor principal: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20707 |
Registos relacionados
-
Regarding inspection report of fire pump at BRACU NCP
Por: Brac University
Publicado em: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
Por: Brac University
Publicado em: (2023) -
Preparation for the inspection visit to China
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
Por: Brac University
Publicado em: (2023) -
Request to approve and release payment against assistance of inspecting work
Por: BUCG-ABC Joint Venture
Publicado em: (2023)