Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
1. autor: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20707 |
Podobne zapisy
-
Regarding inspection report of fire pump at BRACU NCP
od: Brac University
Wydane: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
od: Brac University
Wydane: (2023) -
Preparation for the inspection visit to China
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
od: Brac University
Wydane: (2023) -
Request to approve and release payment against assistance of inspecting work
od: BUCG-ABC Joint Venture
Wydane: (2023)