Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Auteur principal: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20707 |
Documents similaires
-
Regarding inspection report of fire pump at BRACU NCP
par: Brac University
Publié: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
par: Brac University
Publié: (2023) -
Preparation for the inspection visit to China
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
par: Brac University
Publié: (2023) -
Request to approve and release payment against assistance of inspecting work
par: BUCG-ABC Joint Venture
Publié: (2023)