Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Prif Awdur: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20707 |
Eitemau Tebyg
-
Regarding inspection report of fire pump at BRACU NCP
gan: Brac University
Cyhoeddwyd: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
gan: Brac University
Cyhoeddwyd: (2023) -
Preparation for the inspection visit to China
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
gan: Brac University
Cyhoeddwyd: (2023) -
Request to approve and release payment against assistance of inspecting work
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023)