Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Hlavní autor: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20707 |
Podobné jednotky
-
Regarding inspection report of fire pump at BRACU NCP
Autor: Brac University
Vydáno: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
Autor: Brac University
Vydáno: (2023) -
Preparation for the inspection visit to China
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
Autor: Brac University
Vydáno: (2023) -
Request to approve and release payment against assistance of inspecting work
Autor: BUCG-ABC Joint Venture
Vydáno: (2023)