Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
Autor principal: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20707 |
Ítems similars
-
Regarding inspection report of fire pump at BRACU NCP
per: Brac University
Publicat: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
per: Brac University
Publicat: (2023) -
Preparation for the inspection visit to China
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
per: Brac University
Publicat: (2023) -
Request to approve and release payment against assistance of inspecting work
per: BUCG-ABC Joint Venture
Publicat: (2023)