Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding the regarding inspection report of fire pump at BRACU NCP of BRACU new campus project..
المؤلف الرئيسي: | Bengal Technological Corporation Ltd.(BTCL) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20707 |
مواد مشابهة
-
Regarding inspection report of fire pump at BRACU NCP
بواسطة: Brac University
منشور في: (2023) -
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
بواسطة: Brac University
منشور في: (2023) -
Preparation for the inspection visit to China
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
بواسطة: Brac University
منشور في: (2023) -
Request to approve and release payment against assistance of inspecting work
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023)