Regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project
This record consists of general correspondence regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project.
| Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Formáid: | General correspondence |
| Teanga: | English |
| Foilsithe / Cruthaithe: |
Brac University
2023
|
| Ábhair: | |
| Rochtain ar líne: | http://hdl.handle.net/10361/20705 |
Míreanna comhchosúla
-
Regarding the deviation in the groove making & pit width at north zone escalator
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Work order for groove cutting of Brac University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Work order for groove cutting, finishing, dismantling lab floor tiles, re-plastering or install for Brac University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Drip groove on 4F roof (RFA-502_Rev A)
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023) -
Confirmation to manufacture north zone escalator from B1 to Level 10
de réir: Brac University
Foilsithe / Cruthaithe: (2023)