Regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project
This record consists of general correspondence regarding the deviation in the groove making & pit width at north zone escalator of BRAC University new campus project.
| Автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
|---|---|
| Формат: | General correspondence |
| Мова: | English |
| Опубліковано: |
Brac University
2023
|
| Предмети: | |
| Онлайн доступ: | http://hdl.handle.net/10361/20705 |
Схожі ресурси
-
Regarding the deviation in the groove making & pit width at north zone escalator
за авторством: Brac University
Опубліковано: (2023) -
Work order for groove cutting of Brac University new campus project
за авторством: Brac University
Опубліковано: (2023) -
Work order for groove cutting, finishing, dismantling lab floor tiles, re-plastering or install for Brac University new campus project
за авторством: Brac University
Опубліковано: (2023) -
Drip groove on 4F roof (RFA-502_Rev A)
за авторством: WOHA Designs PTE LTD, та інші
Опубліковано: (2023) -
Confirmation to manufacture north zone escalator from B1 to Level 10
за авторством: Brac University
Опубліковано: (2023)