Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20685 |
Những quyển sách tương tự
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
The status of MEP IFC drawing
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Revised IFC drawings impact to the construction period
Bằng: Brac University
Được phát hành: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2024) -
IFC drawing queries
Bằng: Brac University
Được phát hành: (2023)