Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20685 |
Liknande verk
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
The status of MEP IFC drawing
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Revised IFC drawings impact to the construction period
av: Brac University
Publicerad: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
IFC drawing queries
av: Brac University
Publicerad: (2023)