Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20685 |
Схожие документы
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
The status of MEP IFC drawing
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Revised IFC drawings impact to the construction period
по: Brac University
Опубликовано: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2024) -
IFC drawing queries
по: Brac University
Опубликовано: (2023)