Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20685 |
Registos relacionados
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
The status of MEP IFC drawing
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Revised IFC drawings impact to the construction period
Por: Brac University
Publicado em: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2024) -
IFC drawing queries
Por: Brac University
Publicado em: (2023)