Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20685 |
Podobne zapisy
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
The status of MEP IFC drawing
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Revised IFC drawings impact to the construction period
od: Brac University
Wydane: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2024) -
IFC drawing queries
od: Brac University
Wydane: (2023)