Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20685 |
Gelijkaardige items
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
The status of MEP IFC drawing
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Revised IFC drawings impact to the construction period
door: Brac University
Gepubliceerd in: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
IFC drawing queries
door: Brac University
Gepubliceerd in: (2023)