Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20685 |
類似資料
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
The status of MEP IFC drawing
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Revised IFC drawings impact to the construction period
著者:: Brac University
出版事項: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2024) -
IFC drawing queries
著者:: Brac University
出版事項: (2023)