Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20685 |
Documenti analoghi
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
The status of MEP IFC drawing
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Revised IFC drawings impact to the construction period
di: Brac University
Pubblicazione: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2024) -
IFC drawing queries
di: Brac University
Pubblicazione: (2023)