Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20685 |
समान संसाधन
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
The status of MEP IFC drawing
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Revised IFC drawings impact to the construction period
द्वारा: Brac University
प्रकाशित: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2024) -
IFC drawing queries
द्वारा: Brac University
प्रकाशित: (2023)