Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20685 |
Documents similaires
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
The status of MEP IFC drawing
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Revised IFC drawings impact to the construction period
par: Brac University
Publié: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
IFC drawing queries
par: Brac University
Publié: (2023)