Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20685 |
Similar Items
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
The status of MEP IFC drawing
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Revised IFC drawings impact to the construction period
by: Brac University
Published: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2024) -
IFC drawing queries
by: Brac University
Published: (2023)