Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20685 |
Παρόμοια τεκμήρια
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
The status of MEP IFC drawing
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Revised IFC drawings impact to the construction period
ανά: Brac University
Έκδοση: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2024) -
IFC drawing queries
ανά: Brac University
Έκδοση: (2023)