Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20685 |
Eitemau Tebyg
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
The status of MEP IFC drawing
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Revised IFC drawings impact to the construction period
gan: Brac University
Cyhoeddwyd: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
IFC drawing queries
gan: Brac University
Cyhoeddwyd: (2023)