Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Hlavní autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20685 |
Podobné jednotky
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
The status of MEP IFC drawing
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Revised IFC drawings impact to the construction period
Autor: Brac University
Vydáno: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2024) -
IFC drawing queries
Autor: Brac University
Vydáno: (2023)