Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
This record consists of general correspondence regarding providing the revised IFC drawing of plumbing of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20685 |
Ítems similars
-
Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
The status of MEP IFC drawing
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Revised IFC drawings impact to the construction period
per: Brac University
Publicat: (2023) -
Plumbing as-built drawing of BRAC University New Campus Project for RAJUK
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2024) -
IFC drawing queries
per: Brac University
Publicat: (2023)